Henectus tincidunt

$429.00

Consequat a scelerisque suspendisse vel et eget eu vitae adipiscing nibh scelerisque semper cum adipiscing facilisis adipiscing est accumsan lorem vestibulum. Aliquet mus a aptent ullam corper metus accumsan. Habitasse a purus nec ipsum a urna ac ullamcorper varius metus blandit posuere.

Performance Features

111111111111111

Comfort and Fit

22222222222222

Usage and Care

33333333333

Start cooperation with vbike now

Details that make a difference

We provide high-quality products at great value and guide you through every step of your design. With 20 years of cycling apparel experience, Vbike is ready to bring your ideas to life.

LED indicator

Control left and right steering with the remote.

Order Cycle time

Production Timeline

From material prep to final delivery, we provide a clear timeline for each stage, helping you stay on top of your project.

Total duration: 6-12 weeks

Step 1:
Step 1
Confirm Tech Pack (1–3 days)
Step 2:
Step 2
Fabric & Trim Preparation (25–40 days)
Step 3:
Step 3
PP Sample Production (3–7 days)
Step 4:
Step 4
Fabric Cutting (3–5 days)
Step 5:
Step 5
Logo Placement Review (1–2 days)
Step 6:
Step 6
Material Confirmation (2–4 days)
Step 7:
Step 7
Sewing Line Setup (1–3 days)
Step 8:
Step 8
Bulk Sewing (7–15 days)
Step 9:
Step 9
Inspection During Production
Step 10:
Step 10
Thread Trimming & Finishing
Step 11:
Step 11
Packing & Carton Preparation
Step 12:
Step 12
Ready for Shipment